Leesburg Committee Notes: May 18, 2023
Chair: Jessee Maloney
Members Present:
- John Carter
- Tim Cotter
- Scott Silvers
- Mark Millsap
- Jennifer Chu
Completed Tasks:
- Back door batteries replaced
- Jessee bought metal drawer at Ikea for 3D Printing
- New Stacking 18" stools were purchased for more seating in classroom
- Light switch with light for dust collector bathroom - Completed - Scott S.- will file receipts for reimbursement
- blank switch/outlet covers - Completed - Scott S.- will file receipts for reimbursement
- Classroom needs outlet on wall fixed / needs box and something to anchor on - fixed - Scott S
- figure out why classroom vent isn't working (turns out there is no vent going to the classroom)
- Emptied Hutch & found a new home.
- John D called copier company about low toner.
- Jennifer sold AC unit
- Metal Shop was rearranged
In Progress Tasks:
- Reorganize Supply Cabinet in main room
- move some items to new supply closet (done)
- move aerosols to fire cabinet
- Install over door organizer in reception area utility closet (done)
- 3D Printing Room was reorganized and rearranged
- patch up the wall and repaint
- move & change pegboard
- build shelves
- Jessee finish shelf for ground up filament
- Hang electronics screen (Jessee)
- New safety signs on how to clean up blood (Jessee)
- build new laceration first aid kit in bathroom
- ordered laceration kit and gloves (done)
- Replace new front wall in reception
- Squirrl heard back from landlord, and we need to prepare and have someone there when it happens?
- New outdoor Hanging Sign
- Jessee picked up custom safety sign brackets from Quail Run Signs
- Pieces need to be powder coated
- Sign needs to be printed on 1/2" acrylic
To-Do List:
- Figure out how to add ductwork from 3d printing to classroom since they are currently not connected and ducts end in 3D printing ceiling
- call HVAC? DIY?
- Mark has volunteered to do this
- Tear down woodshop bookcase
- start with right bookcase to make room for new jointer
- eventually take down the left bookcase
- Mike Dewan wants open storage and everything labeled
- Build new Open House sign holder
- Print Open House yard signs on UV Print.
- Build stand for sublimation printer
- make sublimation printer work
- clean up area around the UV Printer and find new home for marketing stuff
- move marketing to basement
- kidwind needs to pick up fan / Ask Diane
- Utility closet needs to be organized, rearranged and reevaluate what's in there
- Ask Jason to move his buckets
- Fix A/C register vent above classroom door
- Call electrician about all of the small issues were having around the building
- Classroom needs shelves for all the little things everywhere
- Hang fire extinguishers
- have them inspected / figure out schedule / recharge?
- Fire Line on Cardinal Park can do it
- one hung in metal shop
- research how to dispose of fire extinguishers
- Mark has offered to help
- move member storage
- let membership know that we are doing it
- second coat of paint on stairwell to basement
- needs more paint
- install registers in stairwell / qty 3 /
- Ask Squirrl
- Build custom shelves that are narrow
- Resin 3D printing
- needs shelves for vats
- Jessee donating wash n cure station
- make sign for Jupiter about issues with supports
- vent between the bathroom and the sloproom (jessee)
- make sloproom sign
- Label Garbage Cans that are ours with vinyl labels (jessee on workday)
Potential Projects:
- Electronics wants to move a wall
- moving equipment from metal shop to Purcellville
- finishing room
- woodturning needs to piggyback on woodshops dust collection
- floor inlet for dust collector?
- Air compressor tubing needs to be run to woodshop, metal shop, CNC and woodturning
- tubing in metal shop
To Buy:
- vent for bathroom
- 8.5x11 frame for business license
- Kilz white
- Behr base paint
- roach traps
Notes:
Progress Photos: