...
- Electronics/Class Room
- in progress - presentation?
- Site Stewards Thoughts-
View file name V3 Floor Plan Presentation.pdf height 250 - Do we have a projected budget? A proposal for the board? A timeline?
- What about electrical on the wall of tv's? Would switching to the other wall be a better idea? There are more plugs. What about electrical all around?
- What exactly will be stored in this co-space?
- What is being kept from electronics?
- Member storage needs to be anchored to walls. We don't want any preventable accidents. What about the wall that currently has the tv on it?
- Leesburg still needs storage for folding chairs, table tops, and legs. Was that accounted for?
...
- STILL need to figure out Storing Vacuums / Reorganize the Utility Closet -
- Utility Closet needs it's own workday for pulling out, sorting, disposal, and reorganizing.
- Rebuild shelves / aerated shelves
- Search Facebook Marketplace for a network equipment wall mount (ta
- Ceiling Plug - in progress - call Viktor about plug (Jessee will needs to call)
- Lobby Cases -
- progress is being made, need more hands.
- need help powder coating brackets and hinges.
- The reception area gets very warm during the summer, so we are going to hold off until it cools down a little
- Cosplay
- is pretty much finished for now? Thoughts?
- Hanging Sign:
- Sign is assembled.
- Hardware has been powder coated
- The protective plastic piece for the top of each section was ordered and now I am just waiting for a day to apply using epoxy and to clear coat it.
- 3D Printing -
- Tabletops are cut, shellacked and starting to be anchored.
...
- get the front window in the main room fixed
- need to call landlord, again? Who is in contact with them currently? Jonathan White?
- Adhere rubber tiles to floor at bottom of steps
- more trash days? (Scott)
Workday Lists:
make two lists! One is easy stuff, one is building stuff?
...