Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Added new pegboard in the craft area
  • Shelves added in the new supply closet in the main room
  • 3D Printing Room was reorganized and rearranged
  • Basement stairwell was fixed and painted

...

  • Reorganize Supply Cabinet in main room
    • move some items to new supply closet
    • move aerosols to fire cabinet 
    • Install over door organizer in reception area utility closet
  • 3D Printing Room was reorganized and rearranged
    • patch up the wall and repaint
    • move & change pegboard
    • build shelves 
    • Jessee finish shelf for ground up
  • Back door need new batteries
  • Hang electronics screens


To-Do List:

  • Tear down woodshop bookcase
    • start with right bookcase to make room for new jointer
    • eventually take down the left bookcase
    • Mike Dewan wants open storage and everything labeled
  • Empty Hutch
    • Find a new home for the hutch in the reception.
    • Jennifer is taking a photo to put on freecycle
  • Build new Open House sign holder
  • Print Open House yard signs on UV Print.
  • Build stand for sublimation printer
  • clean up area around the UV Printer and find new home for marketing stuff
  • Utility closet needs to be organized, rearranged and reevaluate what's in there
    • find home for ac unit / try selling? / Jennifer?
  • Fix A/C register vent above classroom door
  • Metal Shop needs rearranging
    • we can't get to the fire cabinet
  • New safety signs on how to clean up blood
  • Call electrician about all of the small issues were having around the building
  • Jessee call copier about low toner
  • Classroom needs shelves for all the little things everywhere
  • Classroom needs outlet on wall fixed / needs box and something to anchor on
  • Hang fire extinguishers
    • have them inspected / figure out schedule 
    • Fire Line on Cardinal Park can do it
  • research how to dispose of fire extinguishers 
  • move member storage
    • let membership know that we are doing it
  • Red tool training required signs needed for woodturning
    • Jonathan white is dropping off red plastic
  • second coat of paint on stairwell to basement
  • install registers in stairwell / qty 3
  • anchor the new shelf to wall at top of stairs
  • Resin 3D printing
    • needs shelves for vats
    • Jessee donating wash n cure station
  • figure out why classroom vent isn't working
  • make sign for Jupiter about issues with supports
  • vent between the bathroom and the sloproom
  • make sloproom sign

Potential Projects:

  • Electronics wants to move a wall
  • moving equipment from metal shop to Purcellville 
  • finishing room 
  • woodturning needs to piggyback on woodshops dust collection
  • Air compressor tubing needs to be run to woodshop, metal shop and woodturning
    • tubing in metal shop


To Buy:

  • Light switch with light for dust collector bathroom
  • vent for bathroom
  • Jessee pick up white metal drawer at ikea
  • 8.5x11 frame for business license
  • blank switch/outlet covers

Image Added



Notes:


Progress Photos: