  • Member Storage is Being Reorganized: Everyone on the committee has been slowly going through member storage to make sure its actually members stuff. Several things that were not have been relocated and more storage will be available soon.
  • The Cosplay Area: John Dubelko received permission to remove the non-load bearing wall in the basement as part of the cosplay renovations. However we can not continue until we have a permit AND have an electrician in to look at things.
  • Metal Shop: Brad Hess has started working on reorganizing and redesigning the metal shop. Once complete we will have proper storage for all endmills, a new home for the smaller CNC, plus other tools that are normally just stuck in there will have a proper home.


To-Do List:


  • We need an the electrician to come through to look at outlets that are not working, plus add on plugs for the Roland UV Printer, multiple tools in the Metal Shop plus possibly more in work on the cosplay area. 
  • The Woodshop bathroom is wasted space and needs to be finished,
    • update: items for this were added to the budget request
  • Drop ceilings need to be replaced in the main room, that way if we have any new leaks, we will know and not confuse the old leaks for new leaks. Plus, it will look nicer.
    • update: items for this were added to the budget request
  • Finish painting the hallway on the right side.
    • update: items for this were added to the budget request
  • The light bulbs need to be disposed of
  • AC Ductwork needs to be added to two vents in the main room in Leesburg, otherwise we are just continuing to cool/heat the ceiling area above the drop ceiling.
    • update: items for this were added to the budget request
  • The area between the woodshop and member storage needs to be cleaned out and organized
    • update: items for this were added to the budget request
  • The woodturning room needs to be worked on/completed
  • We need to schedule a monthly workday.  Saturday, JUly 14th has been suggested and will most likely be the day.
  • Run Ethernet Cables since we are having issues with machines, specifically BIG Red, connecting
  • Clean out the metal cabinets in the main room. The beige one on wheels is staying and will be painted to match the Arts & Crafts Area.
    • update: items for this were added to the budget request
  • Main Entry Room needs some love. Maggie Toth has offered her help.
    • update: items for this were added to the budget request



Notes:


Progress Photos: