  • We need an electrician to come through to look at outlets that are not working, plus add on plugs for the Roland UV Printer, multiple tools in the Metal Shop plus possibly more in the cosplay area. 
  • The Woodshop bathroom is wasted space and needs to be finished
  • Drop ceilings need to be replaced in the main room, that way if we have any new leaks, we will know and not confuse the old leaks for new leaks. Plus, it will look nicer.
  • Finish painting the hallway on the right side.
  • The light bulbs need to be disposed of
  • AC Ductwork needs to be added to two vents in the main room in Leesburg, otherwise we are just continuing to cool/heat the ceiling area above the drop ceiling.
  • The area between the woodshop and member storage needs to be cleaned out and organized
  • The woodturning room needs to be worked on/completed
  • We need to schedule a monthly workday.  Saturday, JUly 14th has been suggested and will most likely be the day.



Notes:

Please direct future to-do list items here: https://docs.google.com/forms/d/e/1FAIpQLSfGrqMaSniiE7VvnqQEcErkOKaEGt5LjoE-tkjLLUT1GTkA8A/viewform?usp=sf_link

instead of sending a SLACK message or email. This way we can keep better records in a spreadsheet. Also, if you don’t ask, it may not get done, we are not mind readers over here (smile)!!

Also, please note that large projects may require a virtual meetup. We both work from home and are open to different times and days.